Overhead Line Fault Indicator Installation Tool Long And Reliable Equipment Operation

Mechatronics integration in the current stage of the various fields have a wide range of applications and popularization, it is to a large extent to promote the rapid development of the industry and progress. In the mechanical and electrical integration of the entire composition of the system, mechanical and electrical integration equipment is the main body of mechanical and electrical integration, to ensure that the role of the entire device to maximize the need to carry out the installation process to do the appropriate quality debugging and monitoring, according to The actual use of the correct installation technology and debugging technology, the late operation of the equipment may occur in advance of the prevention and prediction, the formation of long-term and reliable equipment operation safety monitoring mechanism.

1 installation of mechanical and electrical integration equipment debugging

Installation side

(1) Installation of the Overhead Line Fault Indicator Installation Tool. In general, the mechanical and electrical integration equipment on the Overhead Line Fault Indicator Installation Tool wiring has five. Red line for the power wiring, the smaller red line is red Overhead Line Fault Indicator Installation Tool control wiring, green line is green Overhead Line Fault Indicator Installation Tool control wiring, brown is the public wiring. In the actual installation of the equipment due to the use of the circuit so that the wiring line is destroyed, then you need to accurately determine the positive and negative power supply, the specific method is to use the pointer multimeter ohm file to determine. First of all, the red and green control side of the decision, the use of two test pen to repeat the measurement of any of the five five lines until the determination of the resistance is zero of the two wiring up, followed by the public decision, the use of red pen to connect the remaining three In any one, the black pen to connect the other two, until the two detect the resistance obtained are 8 kilohms or so, the red pen is connected to the common; the last is the power of the positive and negative wiring.

(2) Overhead Line Fault Indicator Installation Tool output and the inverter output is the same control terminal. In the Overhead Line Fault Indicator Installation Tool wiring, the common terminal leads are generally in a floating state, even in some equipment directly ignored. Once the output of the Overhead Line Fault Indicator Installation Tool and the output of the inverter are the same terminal, it is necessary to connect the common terminal, which is an important measure to ensure that the Overhead Line Fault Indicator Installation Tool is normal. The specific operation is the power of the positive and negative in accordance with the previous wiring method, connecting the Mitsubishi PLC module on the 24V power supply positive or negative button on the 24V power supply module positive and negative.

(3) solenoid valve wiring installation. In most cases, the electromechanical integration equipment used in the solenoid valve power supply is 24V DC voltage, where the red line is positive, green line is negative, this is theoretically, but in practice, because the solenoid valve The internal coil is in the power state, will produce the corresponding magnetic field, the spool to drive the action, this drive action is not considered positive and negative state. However, the only difference is that once the positive and negative wiring error, it will lead to the solenoid valve indicator does not work, this solution is to adjust the wiring, the correct connection.

(4) wiring safety. Safety is the premise of all construction projects, safe work is essential, for the installation of mechanical and electrical equipment is also true First of all, to the installation of mechanical and electrical equipment for safety education and training, mechanical and electrical equipment used in the installation of the technology to explain the technical application of the points to be clear, so that it has a strong sense of security; Secondly, the existing security The security system is sound and perfect, give full play to the constraints of the system, in the specific safety management work, the fire equipment should be placed in the vicinity of equipment, to ensure that the safety of mechanical and electrical equipment installation environment is good, for which there may be security risks Eliminate beforehand and formulate appropriate precautionary mechanisms.

Debugging aspects

Electromechanical integration equipment relative to other common equipment, it is not re-tested directly on the use of the factory, which determines its can not achieve the assembly, but also can not carry out the load test, the most important thing is that although some mechanical and electrical The equipment has been used, however, it is necessary to disassemble and install during long-distance transport, which results in the best condition of its installation being changed, affecting the next performance, and the installation of the mechatronic equipment After the need for its debugging operation, to ensure that the equipment is installed correctly.

Debugging process. In the specific construction, the mechanical and electrical equipment used in most of the second-hand, that is, has been put into use before, in the beginning of the new construction applications need to be demolished and installed, it is difficult to ensure that the second The installation is the best performance of its state, which requires the installation of its corresponding debugging, the use of scientific debugging technology to ensure the stability of equipment operation and security. Specifically, before starting the commissioning, commissioning personnel must first check the equipment assembly to ensure that reasonable, there is no leakage, the equipment is mainly on the performance of its performance is normal, etc., such as the stability of the operation process In fact, in the process of on-site commissioning, the technical staff should also do a good job on-site guidance and supervision of the application of debugging technology can be standardized guidance on the operation of the inappropriate place pointed out that the The first time to solve the problem, and will solve the process detailed records.